Quote

Request a Quote

Send your pack requirements and delivery country. Our engineers reply with a design proposal and quotation in 1–3 working days — samples follow in 2–4 weeks.

Tell us about your project

The more detail you give, the faster we can confirm feasibility and price. Mention if you have a drawing, spec sheet or photos of an existing pack.

e.g. 48V 20Ah e-bike pack, 500 units, Germany
reCAPTCHA placeholder — replaced by reCAPTCHA v3 in production

By submitting this form you agree that we may contact you about your enquiry. See our privacy notice.

Fields marked * are required.

Process

From Enquiry to Delivery

A predictable sequence — no design work starts before you approve the proposal.

  • 01You send requirementsApplication, voltage, capacity, dimensions, connectors and quantity.
  • 02We reply with design & quotationWithin 1–3 working days, including cell selection, BMS specification and freight to your country.
  • 03Samples built and tested2–4 weeks after design approval, with capacity, aging and protection-circuit test data.
  • 04Mass production & shipping3–6 weeks after sample approval, with UN 38.3 documentation and dangerous-goods packaging.
E-mail
WhatsApp
Factory
  • No. 108, East Boluo Avenue, Boluo County, Huizhou City, Guangdong, China
  • Visits by appointment

FAQ

Quotation FAQ

Everything you need to know before starting a project with us.

What information should I prepare to get an accurate quotation?
Application, nominal voltage, continuous and peak discharge current, target capacity or runtime, maximum dimensions, connector type, required communication protocol and order quantity.
Do you provide samples before mass production?
Yes. Sample production takes 2–4 weeks after design approval, so you can verify quality and performance before committing to volume.
What is the minimum order quantity?
It depends on the cell configuration and BMS. Standard packs such as 48V e-bike replacements can start from small pilot quantities — as low as 1–5 units for prototyping — while fully custom projects with new tooling require a larger first order.
What are your payment terms?
Advance payment plus final payment. The advance is generally 60–80% of the order value and is due within 3 working days after the order takes effect; the exact split is set in the order contract.

Prefer to talk first? Contact our team